What goes into a knock down and rebuild?
We assess whether rebuilding is better value than extending and renovating, prepare the planning application for the replacement dwelling, manage the demolition notice and asbestos survey, then build the new home. The process runs much like a new build once the old house is cleared.
- Planning application for the replacement dwelling
- Demolition and site clearance
- Reconnection of services and landscaping
How much should I budget for a knock down and rebuild?
Indicative costs for knock down and rebuild. London and the South East usually sit towards the top of each range.
| Knock down and rebuild | Guide price |
|---|---|
| Demolition and site clearance (total) | £15,000 to £35,000 |
| Rebuild, standard specification (per m²) | £2,100 to £2,600 per m² |
| Rebuild, good specification (per m²) | £2,600 to £3,100 per m² |
| Rebuild, high specification (per m²) | £3,100 to £3,700 per m² |
How is a knock down and rebuild approved in Dronfield?
In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.
This needs full planning permission from the council.
What should I think about before starting?
- A replacement dwelling is usually zero-rated for VAT where the old house is demolished completely to ground level.
- Asbestos is common in post-war houses and must be removed by licensed contractors where required.
How does the project run?
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
Your questions answered
How long does it take?
Around 36 to 60 weeks including demolition.
What happens about asbestos?
An asbestos survey is done before demolition and any asbestos is removed safely first.
Who deals with the council for a project in Dronfield?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
Other towns nearby
- Knock down and rebuild in Chesterfield
- Knock down and rebuild in Sheffield
- Knock down and rebuild in Staveley
- Knock down and rebuild in Rotherham
Learn more about knock down and rebuild, or see every project we cover in Dronfield.