Knock down and rebuild · Staveley

Knock down and rebuild in Staveley

We take on knock down and rebuild in Staveley as a complete project: survey, drawings, planning or permitted development checks, building control and the construction itself.

Covering Staveley

We work in Staveley (S43) and the places around it, including Chesterfield, Dronfield and Sheffield.

Homes in the East Midlands

The East Midlands combines red-brick terraces in the cities with a lot of post-war and modern estate housing, so rear extensions, garage conversions and loft conversions are all common.

What is a knock down and rebuild?

We assess whether rebuilding is better value than extending and renovating, prepare the planning application for the replacement dwelling, manage the demolition notice and asbestos survey, then build the new home. The process runs much like a new build once the old house is cleared.

  • Planning application for the replacement dwelling
  • New foundations, structure and full fit-out
  • Reconnection of services and landscaping

What is the guide price for a knock down and rebuild in Staveley?

Indicative costs for knock down and rebuild. London and the South East usually sit towards the top of each range.

Knock down and rebuildGuide price
Demolition and site clearance (total)£15,000 to £35,000
Rebuild, standard specification (per m²)£2,100 to £2,600 per m²
Rebuild, good specification (per m²)£2,600 to £3,100 per m²
Rebuild, high specification (per m²)£3,100 to £3,700 per m²

What approvals does a knock down and rebuild need in England?

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

This needs full planning permission from the council. We prepare the drawings and supporting documents, submit the application and respond to the planning officer.

What should I think about before starting?

  • A replacement dwelling is usually zero-rated for VAT where the old house is demolished completely to ground level.
  • Asbestos is common in post-war houses and must be removed by licensed contractors where required.

How does the project run?

  1. Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
  2. Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

Your questions answered

Is it cheaper to knock down and rebuild or renovate?

It depends on the existing house. Where a house needs major structural work and a large extension, rebuilding can be similar cost and gives a better result. We compare both at feasibility.

How long does it take?

Around 36 to 60 weeks including demolition.

Can you visit a house in Staveley to quote?

Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.

Also covering

Learn more about knock down and rebuild, or see every project we cover in Staveley.