Knock down and rebuild · Sheffield

Knock down and rebuild in Sheffield

Homeowners in Sheffield can get knock down and rebuild from one company: the design, the paperwork and the building work sit with us rather than with three separate firms.

Covering Sheffield

Alongside Sheffield, we also cover Rotherham (6 miles to the north-east), Dronfield and Chapeltown.

Homes in Yorkshire and the Humber

Across Yorkshire and the Humber, older stone and brick terraces sit alongside inter-war semis and newer estates, and dormers and rear extensions are designed to suit each.

What does a knock down and rebuild involve?

We assess whether rebuilding is better value than extending and renovating, prepare the planning application for the replacement dwelling, manage the demolition notice and asbestos survey, then build the new home. The process runs much like a new build once the old house is cleared.

  • Feasibility: rebuild versus extend and renovate
  • Planning application for the replacement dwelling
  • Demolition and site clearance

What will a knock down and rebuild cost?

Indicative costs for knock down and rebuild. London and the South East usually sit towards the top of each range.

Knock down and rebuildGuide price
Demolition and site clearance (total)£15,000 to £35,000
Rebuild, standard specification (per m²)£2,100 to £2,600 per m²
Rebuild, good specification (per m²)£2,600 to £3,100 per m²
Rebuild, high specification (per m²)£3,100 to £3,700 per m²

How is a knock down and rebuild approved in Sheffield?

English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.

This needs full planning permission from the council.

What should Sheffield homeowners check first?

  • A replacement dwelling is usually zero-rated for VAT where the old house is demolished completely to ground level.
  • You will need somewhere to live for most of a year.

What happens after I enquire?

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

What people ask before starting

Is VAT charged on a knock down and rebuild?

Usually not on the new house, if the old one is demolished completely and the new building is a qualifying dwelling.

How long does it take?

Around 36 to 60 weeks including demolition.

Who deals with the council for a project in Sheffield?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Knock down and rebuild near Sheffield

Learn more about knock down and rebuild, or see every project we cover in Sheffield.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote