Covering East Kilbride
Alongside East Kilbride, we also cover Cambuslang (3 miles to the north), Rutherglen and Hamilton.
Homes in Lanarkshire
In Scotland many families extend bungalows and semis, while tenement flats bring shared ownership of roofs and walls that needs agreeing early.
What goes into a knock down and rebuild?
Knock down and rebuild means demolishing an existing house and building a new one in its place, often a bungalow or poorly built post-war house replaced by a larger, more efficient home. Because the new house counts as a new dwelling, the build is usually zero-rated for VAT.
- Planning application for the replacement dwelling
- Asbestos survey, demolition notice and service disconnections
- Reconnection of services and landscaping
How much should I budget for a knock down and rebuild?
Guide prices for knock down and rebuild, including VAT where it applies. Your fixed price is confirmed in writing after the survey.
| Knock down and rebuild | Guide price |
|---|---|
| Demolition and site clearance (total) | £15,000 to £35,000 |
| Rebuild, standard specification (per m²) | £2,100 to £2,600 per m² |
| Rebuild, good specification (per m²) | £2,600 to £3,100 per m² |
| Rebuild, high specification (per m²) | £3,100 to £3,700 per m² |
Do you need permission for a knock down and rebuild in East Kilbride?
Projects in Scotland need a building warrant from the council before any building work starts, and a completion certificate once it is finished. Planning permission is a separate decision. The Party Wall etc. Act does not apply in Scotland; shared walls are governed by title deeds and the law of the tenement where relevant.
This needs planning permission and a building warrant from your council in Scotland before work starts. We prepare both applications.
What can change the price or programme?
- A replacement dwelling is usually zero-rated for VAT where the old house is demolished completely to ground level.
- You will need somewhere to live for most of a year.
How does the project run?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
Knock down and rebuild: common questions
Is VAT charged on a knock down and rebuild?
Usually not on the new house, if the old one is demolished completely and the new building is a qualifying dwelling.
How long does it take?
Around 36 to 60 weeks including demolition.
Who deals with the council for a project in East Kilbride?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
Also covering
- Knock down and rebuild in Cambuslang
- Knock down and rebuild in Rutherglen
- Knock down and rebuild in Hamilton
- Knock down and rebuild in Newton Mearns
Learn more about knock down and rebuild, or see every project we cover in East Kilbride.