Knock down and rebuild · Hamilton

Knock down and rebuild in Hamilton

Knock down and rebuild for homes in Hamilton and the surrounding parts of Lanarkshire, designed around your house and built by our teams under a single written contract.

Covering Hamilton

Hamilton is about 6 miles east of East Kilbride. We also cover Motherwell (2 miles to the north-east), Wishaw and East Kilbride.

Homes in Lanarkshire

In Scotland many families extend bungalows and semis, while tenement flats bring shared ownership of roofs and walls that needs agreeing early.

What goes into a knock down and rebuild?

Knock down and rebuild means demolishing an existing house and building a new one in its place, often a bungalow or poorly built post-war house replaced by a larger, more efficient home. Because the new house counts as a new dwelling, the build is usually zero-rated for VAT.

  • Building warrant application and completion certificate
  • Asbestos survey, demolition notice and service disconnections
  • New foundations, structure and full fit-out

What will a knock down and rebuild cost?

Guide prices for knock down and rebuild, including VAT where it applies. Your fixed price is confirmed in writing after the survey.

Knock down and rebuildGuide price
Demolition and site clearance (total)£15,000 to £35,000
Rebuild, standard specification (per m²)£2,100 to £2,600 per m²
Rebuild, good specification (per m²)£2,600 to £3,100 per m²
Rebuild, high specification (per m²)£3,100 to £3,700 per m²

Planning and building rules in Hamilton

Scottish projects follow a different process from England: the council issues a building warrant before work starts and accepts a completion certificate at the end, alongside any planning permission needed. We prepare both applications.

This needs planning permission and a building warrant from your council in Scotland before work starts.

What should I think about before starting?

  • A replacement dwelling is usually zero-rated for VAT where the old house is demolished completely to ground level.
  • You will need somewhere to live for most of a year.

How does the project run?

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

What people ask before starting

Is it cheaper to knock down and rebuild or renovate?

It depends on the existing house. Where a house needs major structural work and a large extension, rebuilding can be similar cost and gives a better result. We compare both at feasibility.

How long does it take?

Around 36 to 60 weeks including demolition.

Who deals with the council for a project in Hamilton?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Knock down and rebuild near Hamilton

Learn more about knock down and rebuild, or see every project we cover in Hamilton.