Covering Acton
Alongside Acton, we also cover Chiswick, Shepherd's Bush (2 miles to the east) and Willesden.
Homes in London
Much of London’s housing is Victorian and Edwardian terraces, which is why side return extensions, rear dormers and mansards are so common. Many streets are in conservation areas, and several boroughs use Article 4 directions that remove some permitted development rights.
What goes into a new-build home?
We can take a plot from feasibility through planning, detailed design, building regulations, construction and handover, or build to a design and planning permission you already have. The structure can be traditional masonry or timber frame, and we work to the energy and ventilation rules that apply to new homes in each nation.
- Groundworks, services and drainage connections
- Superstructure, roof, windows and external finishes
- Full internal fit-out and landscaping
How much does a new-build home cost in Acton?
Typical ranges for new-build homes. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.
| New-build homes | Guide price |
|---|---|
| Standard specification | £2,000 to £2,500 per m² |
| Good specification | £2,500 to £3,000 per m² |
| High specification | £3,000 to £3,600 per m² |
Do you need permission for a new-build home in Acton?
Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.
This needs full planning permission from the council.
What can affect a new-build home?
- Utility connections (water, sewer, power) can take months to arrange, so we apply early.
- Planning conditions often need discharging before work starts.
From first call to completion
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
Questions about a new-build home in Acton
Is VAT charged on building a new house?
Building a new dwelling is usually zero-rated when done by a VAT-registered builder. We confirm the position for your project.
How long does it take to build a house?
Usually 30 to 52 weeks on site, depending on size and method of construction.
Do you work in Acton?
Yes. Acton is within our coverage for new-build homes, along with nearby Chiswick and Shepherd's Bush.
Other towns nearby
- New-build homes in Chiswick
- New-build homes in Shepherd's Bush
- New-build homes in Willesden
- New-build homes in Barnes
Learn more about new-build homes, or see every project we cover in Acton.

