Covering Chiswick
Our coverage around Chiswick (W4) also includes Acton (1 miles to the north-west) and Barnes.
Homes in London
London projects often mean working on period terraces with neighbours on both sides, tight access through the house and conservation area controls, so careful planning and party wall work matter as much as the build.
What does a new-build home involve?
A new-build home is a house built from the ground up on a plot, whether a one-off self-build for your family or a small group of homes. Building a new dwelling is usually zero-rated for VAT when carried out by a VAT-registered builder, which is a major cost difference from extensions and renovations.
- Design, planning application and discharge of conditions
- Building regulations design and warranty liaison
- Groundworks, services and drainage connections
How much should I budget for a new-build home?
What new-build homes typically cost. These are guide ranges; the written quote for your house replaces them.
| New-build homes | Guide price |
|---|---|
| Standard specification | £2,000 to £2,500 per m² |
| Good specification | £2,500 to £3,000 per m² |
| High specification | £3,000 to £3,600 per m² |
Planning and building rules in Chiswick
Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.
This needs full planning permission from the council.
What should I think about before starting?
- Utility connections (water, sewer, power) can take months to arrange, so we apply early.
- Self-builders can usually reclaim VAT on certain materials through HMRC’s DIY housebuilders scheme where they buy them directly.
How does the project run?
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
New-build homes: common questions
Is VAT charged on building a new house?
Building a new dwelling is usually zero-rated when done by a VAT-registered builder. We confirm the position for your project.
How long does it take to build a house?
Usually 30 to 52 weeks on site, depending on size and method of construction.
Can you visit a house in Chiswick to quote?
Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.
New-build homes near Chiswick
- New-build homes in Acton
- New-build homes in Barnes
- New-build homes in Shepherd's Bush
- New-build homes in Notting Hill
Learn more about new-build homes, or see every project we cover in Chiswick.

