Covering New Malden
New Malden is about 9 miles south-west of London. We also cover Surbiton (2 miles to the west), Morden and Wimbledon.
Homes in London
Terraced houses dominate many London neighbourhoods, so most projects involve shared walls, narrow access and a party wall process. Conservation areas are widespread, and some boroughs have their own mansard and basement guidance.
What do you get with a new-build home?
We can take a plot from feasibility through planning, detailed design, building regulations, construction and handover, or build to a design and planning permission you already have. The structure can be traditional masonry or timber frame, and we work to the energy and ventilation rules that apply to new homes in each nation.
- Plot appraisal and feasibility
- Building regulations design and warranty liaison
- Groundworks, services and drainage connections
What is the guide price for a new-build home in New Malden?
What new-build homes typically cost. These are guide ranges; the written quote for your house replaces them.
| New-build homes | Guide price |
|---|---|
| Standard specification | £2,000 to £2,500 per m² |
| Good specification | £2,500 to £3,000 per m² |
| High specification | £3,000 to £3,600 per m² |
Planning and building rules in New Malden
Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.
This needs full planning permission from the council.
What can affect a new-build home?
- Utility connections (water, sewer, power) can take months to arrange, so we apply early.
- Self-builders can usually reclaim VAT on certain materials through HMRC’s DIY housebuilders scheme where they buy them directly.
What happens after I enquire?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
Questions about a new-build home in New Malden
How much does it cost to build a new house?
Typically £2,000 to £3,600 per square metre to build, depending on specification, ground conditions and design. New dwellings are usually zero-rated for VAT.
How long does it take to build a house?
Usually 30 to 52 weeks on site, depending on size and method of construction.
How do I get a price for new-build homes in New Malden?
Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.
New-build homes in nearby towns
- New-build homes in Surbiton
- New-build homes in Morden
- New-build homes in Wimbledon
- New-build homes in Ewell
Learn more about new-build homes, or see every project we cover in New Malden.

