New-build homes · Sutton

New-build homes in Sutton

We take on new-build homes in Sutton as a complete project: survey, drawings, planning or permitted development checks, building control and the construction itself.

Covering Sutton

Our coverage around Sutton (CR44, SM1, SM2) also includes Carshalton (2 miles to the north-east) and Banstead.

Homes in London

Much of London’s housing is Victorian and Edwardian terraces, which is why side return extensions, rear dormers and mansards are so common. Many streets are in conservation areas, and several boroughs use Article 4 directions that remove some permitted development rights.

What is a new-build home?

A new-build home is a house built from the ground up on a plot, whether a one-off self-build for your family or a small group of homes. Building a new dwelling is usually zero-rated for VAT when carried out by a VAT-registered builder, which is a major cost difference from extensions and renovations.

  • Building regulations design and warranty liaison
  • Groundworks, services and drainage connections
  • Full internal fit-out and landscaping

How much does a new-build home cost in Sutton?

Use these ranges to budget for new-build homes; the survey turns them into a fixed price for the agreed specification.

New-build homesGuide price
Standard specification£2,000 to £2,500 per m²
Good specification£2,500 to £3,000 per m²
High specification£3,000 to £3,600 per m²

Planning and building rules in Sutton

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

This needs full planning permission from the council. We prepare the drawings and supporting documents, submit the application and respond to the planning officer.

What should I think about before starting?

  • Utility connections (water, sewer, power) can take months to arrange, so we apply early.
  • Planning conditions often need discharging before work starts.

What happens after I enquire?

  1. Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
  2. Site visit. We walk the plot or existing house, look at access, levels, services and boundaries, and talk through what could be built.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

New-build homes: common questions

How long does it take to build a house?

Usually 30 to 52 weeks on site, depending on size and method of construction.

Do I need a structural warranty?

If you need a mortgage or may sell within ten years, a structural warranty or professional consultant’s certificate is usually required.

How do I get a price for new-build homes in Sutton?

Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.

Other towns nearby

Learn more about new-build homes, or see every project we cover in Sutton.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote