Single-storey extensions · Crawley

Single-storey extensions in Crawley

Planning single-storey extensions in Crawley? We design and build them for houses across West Sussex, and we fix the price for the agreed specification in writing before any building work starts.

Covering Crawley

Alongside Crawley, we also cover Horley (4 miles to the north), Horsham and East Grinstead.

Homes in the South East

Housing across the South East mixes inter-war semis, post-war estates and older cottages in villages and market towns, so rear and side extensions, hip-to-gable lofts and garage conversions all come up regularly.

What do you get with a single-storey extension?

We design the extension around how you use the house: where the light comes from, how the new room joins the old one, and what happens to the drains and the garden. The structure is built in brick or block to match the house, finished with a flat roof and lantern or a pitched roof, then insulated, plastered and handed back ready to decorate.

  • Measured survey and design drawings
  • Building control application and inspections
  • Foundations, drainage and structural steel

How much does a single-storey extension cost in Crawley?

What single-storey extensions typically cost. These are guide ranges; the written quote for your house replaces them.

Single-storey extensionsGuide price incl. VAT
Standard specification£2,600 to £3,000 per m²
Good specification£3,000 to £3,500 per m²
High specification£3,500 to £4,000 per m²

What approvals does a single-storey extension need in England?

In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.

In England a single-storey rear extension can often go ahead under permitted development: up to 3 m deep on an attached house or 4 m on a detached one, no higher than 4 m, with eaves no higher than 3 m within 2 m of a boundary. Deeper extensions, up to 6 m or 8 m, need prior approval from the council first.

What should I think about before starting?

  • Drains under the footprint may need diverting or a build-over agreement with the water company.
  • Large glazed areas need to meet energy rules, which can shape the size of doors and rooflights.

What are the steps?

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

Single-storey extensions: common questions

How long does a single-storey extension take to build?

The build itself usually takes 10 to 16 weeks once work starts on site. Design, approvals and ordering usually add 6 to 12 weeks before that.

Will the brick match?

We source the closest available match for colour, size and texture and agree a sample panel with you before laying.

Do you work in Crawley?

Yes. Crawley is within our coverage for single-storey extensions, along with nearby Horley and Horsham.

Also covering

Learn more about single-storey extensions, or see every project we cover in Crawley.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote