Horley is about 18 miles east of Guildford. We also cover Crawley (4 miles to the south), Redhill and Reigate.
Homes in the South East
Many South East homes are inter-war or post-war semis and detached houses with room for rear and side extensions, while historic town centres and villages bring conservation area and listed building controls.
What goes into a single-storey extension?
A single-storey extension adds one level of new floor space to the back or side of a house, usually to open up a kitchen, dining or family room. It is the most common way to gain space without moving, and many can be built without a planning application.
- Measured survey and design drawings
- Planning or lawful development certificate where needed
- First-fix and second-fix electrics, plastering and making good
What will a single-storey extension cost?
Use these ranges to budget for single-storey extensions; the survey turns them into a fixed price for the agreed specification.
| Single-storey extensions | Guide price incl. VAT |
|---|---|
| Standard specification | £2,600 to £3,000 per m² |
| Good specification | £3,000 to £3,500 per m² |
| High specification | £3,500 to £4,000 per m² |
How is a single-storey extension approved in Horley?
In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.
In England a single-storey rear extension can often go ahead under permitted development: up to 3 m deep on an attached house or 4 m on a detached one, no higher than 4 m, with eaves no higher than 3 m within 2 m of a boundary.
What can change the price or programme?
- Drains under the footprint may need diverting or a build-over agreement with the water company.
- Kitchens and doors have long lead times, so we order them early.
What happens after I enquire?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
What people ask before starting
How long does a single-storey extension take to build?
The build itself usually takes 10 to 16 weeks once work starts on site. Design, approvals and ordering usually add 6 to 12 weeks before that.
Can we stay in the house during the build?
Usually yes. We keep the existing house closed off from the works until the knock-through near the end, and agree a temporary kitchen set-up with you if the kitchen is affected.
Who deals with the council for a project in Horley?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
Also covering
- Single-storey extensions in Crawley
- Single-storey extensions in Redhill
- Single-storey extensions in Reigate
- Single-storey extensions in East Grinstead
Learn more about single-storey extensions, or see every project we cover in Horley.