Covering East Grinstead
East Grinstead is about 8 miles east of Crawley. We also cover Horley (7 miles to the north-west), Crawley and Crowborough.
Homes in the South East
The South East has a lot of 1930s and post-war semi-detached housing, well suited to rear extensions and hip-to-gable loft conversions, alongside period properties in conservation areas that need a more careful design.
What is a single-storey extension?
A single-storey extension adds one level of new floor space to the back or side of a house, usually to open up a kitchen, dining or family room. It is the most common way to gain space without moving, and many can be built without a planning application.
- Measured survey and design drawings
- Foundations, drainage and structural steel
- First-fix and second-fix electrics, plastering and making good
How much does a single-storey extension cost in East Grinstead?
Guide prices for single-storey extensions, including VAT where it applies. Your fixed price is confirmed in writing after the survey.
| Single-storey extensions | Guide price incl. VAT |
|---|---|
| Standard specification | £2,600 to £3,000 per m² |
| Good specification | £3,000 to £3,500 per m² |
| High specification | £3,500 to £4,000 per m² |
What approvals does a single-storey extension need in England?
In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.
In England a single-storey rear extension can often go ahead under permitted development: up to 3 m deep on an attached house or 4 m on a detached one, no higher than 4 m, with eaves no higher than 3 m within 2 m of a boundary. Deeper extensions, up to 6 m or 8 m, need prior approval from the council first.
What should East Grinstead homeowners check first?
- Drains under the footprint may need diverting or a build-over agreement with the water company.
- Building on or near a shared boundary usually means serving a party wall notice in England and Wales.
What are the steps?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
Questions about a single-storey extension in East Grinstead
How long does a single-storey extension take to build?
The build itself usually takes 10 to 16 weeks once work starts on site. Design, approvals and ordering usually add 6 to 12 weeks before that.
Will the brick match?
We source the closest available match for colour, size and texture and agree a sample panel with you before laying.
Do you work in East Grinstead?
Yes. East Grinstead is within our coverage for single-storey extensions, along with nearby Horley and Crawley.
Single-storey extensions near East Grinstead
- Single-storey extensions in Horley
- Single-storey extensions in Crawley
- Single-storey extensions in Crowborough
- Single-storey extensions in Haywards Heath
Learn more about single-storey extensions, or see every project we cover in East Grinstead.

