Single-storey extensions · East Grinstead

Single-storey extensions in East Grinstead

We take on single-storey extensions in East Grinstead as a complete project: survey, drawings, planning or permitted development checks, building control and the construction itself.

Covering East Grinstead

East Grinstead is about 8 miles east of Crawley. We also cover Horley (7 miles to the north-west), Crawley and Crowborough.

Homes in the South East

The South East has a lot of 1930s and post-war semi-detached housing, well suited to rear extensions and hip-to-gable loft conversions, alongside period properties in conservation areas that need a more careful design.

What is a single-storey extension?

A single-storey extension adds one level of new floor space to the back or side of a house, usually to open up a kitchen, dining or family room. It is the most common way to gain space without moving, and many can be built without a planning application.

  • Measured survey and design drawings
  • Foundations, drainage and structural steel
  • First-fix and second-fix electrics, plastering and making good

How much does a single-storey extension cost in East Grinstead?

Guide prices for single-storey extensions, including VAT where it applies. Your fixed price is confirmed in writing after the survey.

Single-storey extensionsGuide price incl. VAT
Standard specification£2,600 to £3,000 per m²
Good specification£3,000 to £3,500 per m²
High specification£3,500 to £4,000 per m²

What approvals does a single-storey extension need in England?

In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.

In England a single-storey rear extension can often go ahead under permitted development: up to 3 m deep on an attached house or 4 m on a detached one, no higher than 4 m, with eaves no higher than 3 m within 2 m of a boundary. Deeper extensions, up to 6 m or 8 m, need prior approval from the council first.

What should East Grinstead homeowners check first?

  • Drains under the footprint may need diverting or a build-over agreement with the water company.
  • Building on or near a shared boundary usually means serving a party wall notice in England and Wales.

What are the steps?

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

Questions about a single-storey extension in East Grinstead

How long does a single-storey extension take to build?

The build itself usually takes 10 to 16 weeks once work starts on site. Design, approvals and ordering usually add 6 to 12 weeks before that.

Will the brick match?

We source the closest available match for colour, size and texture and agree a sample panel with you before laying.

Do you work in East Grinstead?

Yes. East Grinstead is within our coverage for single-storey extensions, along with nearby Horley and Crawley.

Single-storey extensions near East Grinstead

Learn more about single-storey extensions, or see every project we cover in East Grinstead.