Covering Swindon
Our coverage around Swindon (SN1, SN25, SN26) also includes Calne, Wantage and Chippenham.
Homes in the South West
Homes in the South West range from coastal and rural properties in stone and slate to city terraces and modern estates, so extensions are designed to match the local materials.
What is included in a structural alteration in Swindon?
We arrange the structural calculations, support the floors and roof above with temporary props while the wall comes out, install the steel on padstones, then encase it for fire protection and make good. Chimney breast removals and new openings in external walls follow the same process.
- Building control application and inspections
- Steel beam installation on padstones
- Fire protection and plaster encasement
What will a structural alteration cost?
Indicative costs for structural alterations. London and the South East usually sit towards the top of each range.
| Structural alterations | Guide price incl. VAT |
|---|---|
| Single load-bearing wall removal with steel | £3,000 to £7,500 |
| Chimney breast removal with support | £1,800 to £4,500 |
| Multiple walls or full open-plan remodel | £8,000 to £20,000 |
What approvals does a structural alteration need in England?
Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.
Internal work like this does not usually need planning permission unless the house is listed or your permitted development rights have been removed. It does need building regulations approval because it affects the structure.
What can change the price or programme?
- The beam size can mean a downstand in the ceiling unless it is set flush within the floor.
- Removing walls can affect the fire escape route on open-plan ground floors in three-storey houses.
What happens after I enquire?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
What people ask before starting
How long does it take?
The structural work is usually done in a few days, with one to three weeks including making good.
Can the steel be hidden in the ceiling?
Often it can be set within the floor depth, avoiding a downstand. The engineer confirms what is possible.
Who deals with the council for a project in Swindon?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
Other towns nearby
- Structural alterations in Calne
- Structural alterations in Wantage
- Structural alterations in Chippenham
- Structural alterations in Devizes
Learn more about structural alterations, or see every project we cover in Swindon.

