Wraparound extensions · Cheadle Hulme

Wraparound extensions in Cheadle Hulme

Planning wraparound extensions in Cheadle Hulme? We design and build them for houses across Greater Manchester, and we fix the price for the agreed specification in writing before any building work starts.

Covering Cheadle Hulme

Cheadle Hulme sits 8 miles south of Manchester, with Stockport 3 miles to the north-east and Wilmslow 4 miles to the south-west.

Homes in the North West

Across the North West, Victorian terraces, inter-war semis and modern estates all feature, and brick or stone matching is chosen to suit each street.

What goes into a wraparound extension?

Because it removes two external walls, a wraparound needs careful structural design and a good plan for the corner where the steels meet. We design, apply for any permissions, build and finish the shell, and can fit the kitchen as part of the same contract.

  • Steel frame or goalpost for the corner opening
  • Pitched, flat or glazed roof with rooflights
  • Glazing, insulation, plastering and electrics

What is the guide price for a wraparound extension in Cheadle Hulme?

Typical ranges for wraparound extensions. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.

Wraparound extensionsGuide price incl. VAT
Standard specification£3,400 to £3,800 per m²
Good specification£3,800 to £4,250 per m²
High specification£4,250 to £4,700 per m²

How is a wraparound extension approved in Cheadle Hulme?

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

In England a wraparound extension is treated as one extension, and because it covers both the side and the rear it does not normally fit within permitted development.

What should I think about before starting?

  • The corner steel connection is the critical detail and is designed by a structural engineer.
  • Both neighbours may need party wall notices.

How does the project run?

  1. Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
  2. Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

Wraparound extensions: common questions

How long does a wraparound take?

Around 12 to 18 weeks on site after approvals.

Glazed roof or solid roof?

A mix usually works best: solid roof with rooflights over the kitchen and a glazed section over the dining area.

Do you work in Cheadle Hulme?

Yes. Cheadle Hulme is within our coverage for wraparound extensions, along with nearby Stockport and Wilmslow.

Wraparound extensions in nearby towns

Learn more about wraparound extensions, or see every project we cover in Cheadle Hulme.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote